(Coordinated Resource Offering Protocol)
Home Page Search by All Species:             Douglas-Fir - Engelmann Spruce - Grand Fir - Lodgepole Pine - Ponderosa Pine
                                               Subalpine Fir - Western Hemlock - Western Larch - Western Redcedar - Western White Pine
 
CROP Information
How to Use this Site/FAQ

Interactive Haul Distance Map
All Agencies Overview
Resource Offering Type
Diameter Size Overview
NEPA Overview



BLM:
  1.   Cottonwood FO (ID)

  1.   Lochsa RD
  2.   North Fork RD
  3.   Palouse RD
  4.   Powell RD

  1.   Clearwater RD
  2.   Moose Creek RD
  3.   Red River RD
  4.   Salmon River RD

  1.   Clearwater SA
  2.   Craig Mountain SA
  3.   Maggie Creek SA
  4.   Ponderosa SA

Nez Perce Tribe:
  1.   Nez Perce Tribe

Search Database

Enter Database*

*Login Required




Abbreviations:

Names:
AFB - Air Force Base
DNR - Dept. of Natural Resources
DWF & P - Dept. of Wildlife,  Fisheries,
                     & Parks
FO - Field Office
NF - National Forest
NRA - National Recreation Area
LO - Land Office
RD - Ranger District
SA - Supervisory Area


Diameter Size Grouping:
<7” - Biomass (in mmbf and gT)
7” – 12” - Small Log (in mmbf)
>12” - Large Log (in mmbf)


Resource Offering (Harvest) Types:
BIO - Biomass (subject to buyer interest)
CT - Commercial Thinning
FW - Fuel Wood
Mech - Mechanical
PCT - Pre-Commercial Thinning
P/P - Post and Pole
RX Burn - RX Burning (NEPA Approved)
Stwshp - Stewardship
TS - Timber Sale


NEPA Status:
(National Environmental Policy Act)
APP - Approved
IP - In Process
JS - Just Started
NS - Not Started
 
 
Last Updated 06-02-2010
North Central Idaho CROP: Engelmann Spruce offering/removal 2010-2014
(gT = 2,464 / S = 0.212 mmbf / L = 3.467 mmbf)
(4.172 total mmbf)
gT = green tons (up to 7"dbh)
S = small log mmbf (>7"-12"dbh)
L = large log mmbf (>12"dbh)
 
Agencies
 
 
Clearwater NF: 3 RDs ~ 2%
(gT = 25 / S = 0.034 / L = 0.030)
Idaho Dept. of Lands: 4 SAs ~ 98%
(gT = 2,439 / S = 0.178 / L = 3.437)
 
BLM Field Offices
 
 
 
gT mmbf
Engelmann Spruce Biomass Small Log Large Log
2010 609.6 0.049 0.875
2011 609.6 0.045 0.859
2012 634.6 0.075 0.874
2013 609.6 0.045 0.859
2014 0.0 0.000 0.000
Totals 2,463.5 0.212 3.467
% 12% 5% 83%
mmbf 0.493  
 
 
Engelmann Spruce Diameter by Year
 
 
 
Engelmann Spruce NEPA Process Overview
 
Engelmann Spruce
NEPA Process
2010 2011 2012 2013 2014 5-Yr Total
Approved 0.000 0.0% 0.000 0.0% 0.050 100.0% 0.000 0.0% 0.000 0.0% 0.050 71.9%
In Process 0.020 100.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.020 28.1%
Just Started0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0%
Not Started 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0%
NEPA Total0.020 28.1% 0.000 0.0% 0.050 71.9% 0.000 0.0% 0.000 0.0% 0.070 100.0%
NEPA Process - N/A1.026 98.1% 1.026 100.0% 1.026 95.4% 1.026 100.0% 0.000 0.0% 5.237 98.3%
Total1.045 25.1% 1.026 24.6% 1.076 25.8% 1.026 24.6% 0.000 0.0% 4.172 100.0%
 
 
Engelmann Spruce Living/Dead Overview
 
Engelmann Spruce
Living/Dead
2010 2011 2012 2013 2014 5-Yr Total
Living 1.045 100.0% 1.026 100.0% 1.076 100.0% 1.026 100.0% 0.000 0.0% 4.172 100.0%
Dead 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0%
Total 1.045 25.1% 1.026 24.6% 1.076 25.8% 1.026 24.6% 0.000 0.0% 4.172100.0%
 
 
Engelmann Spruce Biomass Offering Overview
(gT = green tons)
 
Engelmann Spruce
Biomass/Timber Sale Biomass
2010 2011 2012 2013 2014 5-Yr Total
Biomass (gT) 609.6 100.0% 609.6 100.0% 634.6 100.0% 609.6 100.0% 0.0 0.0% 2,463.5 100.0%
Small Log Biomass (gT) 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0%
Large Log Biomass (gT) 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0%
Total (gT) 609.6 24.7% 609.6 24.7% 634.6 25.8% 609.6 24.7% 0.0 0.0% 2,463.5100.0%
 
 
Engelmann Spruce Resource Offering Overview
 
Engelmann Spruce
Resource Offering Type
2010 2011 2012 2013 2014 5-Yr Total
Timber Sale 1.045 100.0% 1.026 100.0% 1.076 100.0% 1.026 100.0% 0.000 0.0% 4.172 100.0%
Total 1.045 25.1% 1.026 24.6% 1.076 25.8% 1.026 24.6% 0.000 0.0% 4.172 100.0%
 
 
Engelmann Spruce Road Access Overview
 
Engelmann Spruce
Road Access
2010 2011 2012 2013 2014 5-Yr Total
Yes 1.045 100.0% 1.026 100.0% 1.126 100.0% 1.026 100.0% 0.000 0.0% 4.222 100.0%
No 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0%
Total 1.045 24.8% 1.026 24.3% 1.126 26.7% 1.026 24.3% 0.000 0.0% 4.222100.0%
 
 
 
Engelmann Spruce 5-year offering by Agency: Clearwater SA
 
Engelmann Spruce
Idaho Dept. of Lands:
Clearwater SA
5-yr = 3.4 mmbf
gT = 2,723
  • <4" = 0.0 % (0.000 mmbf)
  • 4"-7" = 0.0 % (0.000 mmbf)
  • <7" = 16.1 % (0.545 mmbf)
S = 0.143
  • 7"-9" = 0.0 % (0.000 mmbf)
  • 9"-12" = 0.0 % (0.000 mmbf)
  • 7"-12" = 4.2 % (0.143 mmbf)
L = 2.695
  • >12" = 79.7 % (2.695 mmbf)
View Offering By Year: 2009 ~ 2010 ~ 2011 ~ 2012 ~ 2013
View 5-Year Data Table
Return to Maps
 
Engelmann Spruce 5-year offering by Agency: Craig Mountain SA
 
Engelmann Spruce
Idaho Dept. of Lands:
Craig Mountain SA
5-yr = 0.4 mmbf
gT = 171
  • <4" = 0.0 % (0.000 mmbf)
  • 4"-7" = 0.0 % (0.000 mmbf)
  • <7" = 7.7 % (0.034 mmbf)
S = 0.023
  • 7"-9" = 0.0 % (0.000 mmbf)
  • 9"-12" = 0.0 % (0.000 mmbf)
  • 7"-12" = 5.2 % (0.023 mmbf)
L = 0.389
  • >12" = 87.1 % (0.389 mmbf)
View Offering By Year: 2009 ~ 2010 ~ 2011 ~ 2012 ~ 2013
View 5-Year Data Table
Return to Maps
 
Engelmann Spruce 5-year offering by Agency: Maggie Creek SA
 
Engelmann Spruce
Idaho Dept. of Lands:
Maggie Creek SA
5-yr = 0.4 mmbf
gT = 153
  • <4" = 0.0 % (0.000 mmbf)
  • 4"-7" = 0.0 % (0.000 mmbf)
  • <7" = 7.6 % (0.031 mmbf)
S = 0.021
  • 7"-9" = 0.0 % (0.000 mmbf)
  • 9"-12" = 0.0 % (0.000 mmbf)
  • 7"-12" = 5.1 % (0.021 mmbf)
L = 0.350
  • >12" = 87.2 % (0.350 mmbf)
View Offering By Year: 2009 ~ 2010 ~ 2011 ~ 2012 ~ 2013
View 5-Year Data Table
Return to Maps
 
Engelmann Spruce 5-year offering by Agency: North Fork RD
 
Engelmann Spruce
Clearwater NF:
North Fork RD
5-yr = 0.1 mmbf
gT = 25
  • <4" = 0.0 % (0.000 mmbf)
  • 4"-7" = 10.0 % (0.005 mmbf)
  • <7" = 0.0 % (0.000 mmbf)
S = 0.030
  • 7"-9" = 15.0 % (0.008 mmbf)
  • 9"-12" = 45.0 % (0.023 mmbf)
  • 7"-12" = 0.0 % (0.000 mmbf)
L = 0.015
  • >12" = 30.0 % (0.015 mmbf)
View Offering By Year: 2009 ~ 2010 ~ 2011 ~ 2012 ~ 2013
View 5-Year Data Table
Return to Maps
 
Engelmann Spruce 5-year offering by Agency: Palouse RD
 
Engelmann Spruce
Clearwater NF:
Palouse RD
5-yr = 0.04471 mmbf
gT = 0
  • <4" = 0.0 % (0.000 mmbf)
  • 4"-7" = 0.0 % (0.000 mmbf)
  • <7" = 0.0 % (0.000 mmbf)
S = 0.010
  • 7"-9" = 0.0 % (0.000 mmbf)
  • 9"-12" = 23.4 % (0.010 mmbf)
  • 7"-12" = 0.0 % (0.000 mmbf)
L = 0.034
  • >12" = 76.6 % (0.034 mmbf)
View Offering By Year: 2009 ~ 2010 ~ 2011 ~ 2012 ~ 2013
View 5-Year Data Table
Return to Maps
 
Engelmann Spruce 5-year offering by Agency: Ponderosa SA
 
Engelmann Spruce
Idaho Dept. of Lands:
Ponderosa SA
5-yr = 1.0 mmbf
gT = 98
  • <4" = 0.0 % (0.000 mmbf)
  • 4"-7" = 0.0 % (0.000 mmbf)
  • <7" = 1.9 % (0.020 mmbf)
S = 0.041
  • 7"-9" = 0.0 % (0.000 mmbf)
  • 9"-12" = 0.0 % (0.000 mmbf)
  • 7"-12" = 4.0 % (0.041 mmbf)
L = 0.947
  • >12" = 94.0 % (0.947 mmbf)
View Offering By Year: 2009 ~ 2010 ~ 2011 ~ 2012 ~ 2013
View 5-Year Data Table
Return to Maps
 
Engelmann Spruce 5-year offering by Agency: Powell RD
 
Engelmann Spruce
Clearwater NF:
Powell RD
5-yr = 0.00179 mmbf
gT = 0
  • <4" = 0.0 % (0.000 mmbf)
  • 4"-7" = 0.0 % (0.000 mmbf)
  • <7" = 0.0 % (0.000 mmbf)
S = 0.000
  • 7"-9" = 0.0 % (0.000 mmbf)
  • 9"-12" = 0.0 % (0.000 mmbf)
  • 7"-12" = 0.0 % (0.000 mmbf)
L = 0.002
  • >12" = 100.0 % (0.002 mmbf)
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
 
 

Return to Top
 
 
Coordinated Resource Offering Protocol or "CROP" is an online graphics enabled database assembled by Oregon-based Mater Ltd. to help businesses and community organization groups generate a picture of likely annual fiber offering/supply and characteristics to be offered from public lands and forest restoration projects over the next five years. Valid XHTML 1.0 TransitionalValid CSS!
2008-  Mater Engineering, LTD
Web Design by MyKeyWeb