(Coordinated Resource Offering Protocol)
Home Page Search by All Species:             Bald Cypress - Gum Species - Hardwoods - Loblolly Pine
                                               Longleaf Pine - Oak Species - Red Maple - Slash Pine
 
CROP Information
How to Use this Site/FAQ

Interactive Haul Distance Map
All Agencies Overview
Resource Offering Type
Diameter Size Overview
NEPA Overview



Francis Marion NF:
  1.   Francis Marion NF

Savannah River:
  1.   Savannah River

  1.   Enoree RD
  2.   Long Cane RD

Charleston AFB:
  1.   Charleston AFB

Shaw AFB:
  1.   Shaw AFB

SC DNR:
  1.   SC DNR

South Carolina Forestry Commission:
  1.   SC Forestry Commission

Search Database

Enter Database*

*Login Required




Abbreviations:

Names:
AFB - Air Force Base
DNR - Dept. of Natural Resources
DWF & P - Dept. of Wildlife,  Fisheries,
                     & Parks
FO - Field Office
NF - National Forest
NRA - National Recreation Area
LO - Land Office
RD - Ranger District
SA - Supervisory Area


Diameter Size Grouping:
<7” - Biomass (in mmbf and gT)
7” – 12” - Small Log (in mmbf)
>12” - Large Log (in mmbf)


Resource Offering (Harvest) Types:
BIO - Biomass (subject to buyer interest)
CT - Commercial Thinning
FW - Fuel Wood
Mech - Mechanical
PCT - Pre-Commercial Thinning
P/P - Post and Pole
RX Burn - RX Burning (NEPA Approved)
Stwshp - Stewardship
TS - Timber Sale


NEPA Status:
(National Environmental Policy Act)
APP - Approved
IP - In Process
JS - Just Started
NS - Not Started
 
 
Last Updated 00-00-0000 
State of South Carolina CROP: Long Cane RD
All Species offering/removal 2006-2010
(gT = 66,500 / S = 20.900 mmbf / L = 60.700 mmbf)
gT = green tons (up to 7"dbh)
S = small log mmbf (>7"-12"dbh)
L = large log mmbf (>12"dbh)
 
Sumter National Forest: Long Cane RD
 
 
Loblolly Pine: 100%
gT = 66,500, S = 20.900, L = 60.700
 
gT mmbf
Long Cane RD Biomass Small Log Large Log
2006 13,000.0 3.800 7.100
2007 13,000.0 4.000 9.300
2008 13,500.0 4.100 12.000
2009 13,500.0 4.400 14.800
2010 13,500.0 4.600 17.500
Totals 66,500.0 20.900 60.700
% 14% 22% 64%
mmbf 13.300
 
 
Long Cane RD Diameter by Year
 
 
 
Long Cane RD NEPA Process Overview
 
Long Cane RD NEPA Process 2006 2007 2008 2009 2010 5-Yr Total
Approved 10.900 80.7% 13.300 83.6% 13.300 70.7% 0.000 0.0% 0.000 0.0% 37.500 39.5%
In Process 2.600 19.3% 2.600 16.4% 0.000 0.0% 19.300 88.1% 22.200 89.5% 46.700 49.2%
Just Started 0.000 0.0% 0.000 0.0% 5.500 29.3% 2.600 11.9% 2.600 10.5% 10.700 11.3%
Not Started 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0%
Total 13.500 14.2% 15.900 16.8% 18.800 19.8% 21.900 23.1% 24.800 26.1% 94.900 100.0%
 
 
Long Cane RD Living/Dead Overview
 
Long Cane RD
Living/Dead
2006 2007 2008 2009 2010 5-Yr Total
Living 13.500 100.0% 15.900 100.0% 18.800 100.0% 21.900 100.0% 24.800 100.0% 94.900 100.0%
Dead 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0%
Total 13.500 14.2% 15.900 16.8% 18.800 19.8% 21.900 23.1% 24.800 26.1% 94.900100.0%
 
 
Long Cane RD Biomass Offering Overview
(gT = green tons)
 
Long Cane RD
Biomass/Timber Sale Biomass
2006 2007 2008 2009 2010 5-Yr Total
Biomass (gT) 13,000.0 100.0% 13,000.0 100.0% 13,500.0 100.0% 13,500.0 100.0% 13,500.0 100.0% 66,500.0 100.0%
Small Log Biomass (gT) 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0%
Large Log Biomass (gT) 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0%
Total (gT) 13,000.0 19.5% 13,000.0 19.5% 13,500.0 20.3% 13,500.0 20.3% 13,500.0 20.3% 66,500.0100.0%
 
 
Long Cane RD Resource Offering Overview
 
Long Cane RD
Resource Offering Type
2006 2007 2008 2009 2010 5-Yr Total
Biomass 2.600 19.3% 2.600 16.4% 2.600 13.8% 2.600 11.9% 2.600 10.5% 13.000 13.7%
Commercial Thinning 3.800 28.1% 3.800 23.9% 3.800 20.2% 3.800 17.4% 3.800 15.3% 19.000 20.0%
Timber Sale 7.100 52.6% 9.500 59.7% 12.400 66.0% 15.500 70.8% 18.400 74.2% 62.900 66.3%
Total 13.500 14.2% 15.900 16.8% 18.800 19.8% 21.900 23.1% 24.800 26.1% 94.900 100.0%
 
 
Long Cane RD Road Access Overview
 
Long Cane RD
Road Access
2006 2007 2008 2009 2010 5-Yr Total
Yes 13.500 100.0% 15.900 100.0% 18.800 100.0% 21.900 100.0% 24.800 100.0% 94.900 100.0%
No 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0%
Total 13.500 14.2% 15.900 16.8% 18.800 19.8% 21.900 23.1% 24.800 26.1% 94.900100.0%
 
 
Long Cane RD 5-year offering by Species: Loblolly Pine
 
Long Cane RD
Loblolly Pine
5-yr = 94.9 mmbf
gT = 66,500
  • <4" = 4.7 % (4.500 mmbf)
  • 4"-7" = 9.3 % (8.800 mmbf)
  • <7" = 0.0 % (0.000 mmbf)
S = 20.900
  • 7"-9" = 8.1 % (7.700 mmbf)
  • 9"-12" = 13.9 % (13.200 mmbf)
  • 7"-12" = 0.0 % (0.000 mmbf)
L = 60.700
  • >12" = 64.0 % (60.700 mmbf)
View Offering By Year: 2006 ~ 2007 ~ 2008 ~ 2009 ~ 2010
View 5-Year Data Table
Return to Overview
 
 
 
 

Return to Top
 
 
Coordinated Resource Offering Protocol or "CROP" is an online graphics enabled database assembled by Oregon-based Mater Ltd. to help businesses and community organization groups generate a picture of likely annual fiber offering/supply and characteristics to be offered from public lands and forest restoration projects over the next five years. Valid XHTML 1.0 TransitionalValid CSS!
2008-  Mater Engineering, LTD
Web Design by MyKeyWeb