(Coordinated Resource Offering Protocol)
Home Page Search by All Species:             Douglas-Fir - Incense Cedar - Mixed Conifers - Oak Species
                                               Other Pines - Pinyon Pine-Juniper - Ponderosa Pine-Jeffrey Pine - Red/White Fir
 
CROP Information
How to Use this Site/FAQ

Interactive Haul Distance Map
All Agencies Overview
Resource Offering Type
Diameter Size Overview
NEPA Overview



  1.   Eagle Lake FO (CA)
  2.   Mother Lode FO (CA)
  3.   Redding FO (Butte Co.) (CA)
  4.   Ukiah FO (CA)
  5.   Sierra Front FO (NV)

  1.   Amador RD
  2.   Georgetown RD
  3.   Pacific RD
  4.   Placerville RD

  1.   Bridgeport RD
  2.   Carson RD

  1.   Almanor RD
  2.   Eagle Lake RD
  3.   Hat Creek RD

Lake Tahoe Basin MU (USFS):
  1.   LTBMU

  1.   Covelo/Upper Lake RDs
  2.   Grindstone RD

  1.   Beckwourth RD
  2.   Feather River RD
  3.   Mt. Hough RD

  1.   Calaveras RD
  2.   Mi-Wok RD
  3.   Summit RD

  1.   American River RD
  2.   Sierraville RD
  3.   Truckee RD
  4.   Yuba RD

Nevada Dept of Forestry:
  1.   Sierra Front

UC Center for Forestry:
  1.   Baker Forest
  2.   Blodgett Forest

Search Database

Enter Database*

*Login Required




Abbreviations:

Names:
AFB - Air Force Base
DNR - Dept. of Natural Resources
DWF & P - Dept. of Wildlife,  Fisheries,
                     & Parks
FO - Field Office
NF - National Forest
NRA - National Recreation Area
LO - Land Office
RD - Ranger District
SA - Supervisory Area


Diameter Size Grouping:
<7” - Biomass (in mmbf and gT)
7” – 12” - Small Log (in mmbf)
>12” - Large Log (in mmbf)


Resource Offering (Harvest) Types:
BIO - Biomass (subject to buyer interest)
CT - Commercial Thinning
FW - Fuel Wood
Mech - Mechanical
PCT - Pre-Commercial Thinning
P/P - Post and Pole
RX Burn - RX Burning (NEPA Approved)
Stwshp - Stewardship
TS - Timber Sale


NEPA Status:
(National Environmental Policy Act)
APP - Approved
IP - In Process
JS - Just Started
NS - Not Started
 
 
Last Updated 01-19-2011
Tahoe CROP: Eldorado NF offering/removal 2011-2015
(gT = 76,530 / S = 43.773 mmbf / L = 65.349 mmbf)
(124.428 total mmbf)
gT = green tons (up to 7"dbh)
S = small log mmbf (>7"-12"dbh)
L = large log mmbf (>12"dbh)
 
Eldorado NF
 
 
 
Eldorado NF ~ 100%
(gT = 76,530 / S = 43.773 / L = 65.349)
 
gT mmbf
Eldorado NF Biomass Small Log Large Log
2011 7,460.0 5.7820 14.1700
2012 27,280.0 15.4870 22.0800
2013 22,130.0 11.6570 13.9890
2014 16,480.0 9.3760 13.7820
2015 3,180.0 1.4710 1.3280
Totals 76,530.0 43.7730 65.3490
% 12% 35% 53%
mmbf 15.3060   
 
 
Eldorado NF Diameter by Year
 
 
 
Eldorado NF NEPA Process Overview
 
Eldorado NF
NEPA Process
2011 2012 2013 2014 2015 5-Yr Total
Approved 9.512 44.4% 1.984 4.6% 1.984 6.6% 1.984 7.5% 1.984 57.8% 17.448 14.0%
In Process 11.930 55.6% 41.039 95.4% 0.000 0.0% 0.000 0.0% 0.000 0.0% 52.969 42.6%
Just Started 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0%
Not Started 0.000 0.0% 0.000 0.0% 28.088 93.4% 24.470 92.5% 1.451 42.2% 54.009 43.4%
Total 21.442 17.2% 43.023 34.6% 30.072 24.2% 26.454 21.3% 3.435 2.8% 124.426100.0%
 
 
Eldorado NF Living/Dead Overview
 
Eldorado NF
Living/Dead
2011 2012 2013 2014 2015 5-Yr Total
Living 19.460 90.7% 41.039 95.4% 28.088 93.4% 24.470 92.5% 1.451 42.2% 114.508 92.0%
Dead 1.984 9.3% 1.984 4.6% 1.984 6.6% 1.984 7.5% 1.984 57.8% 9.920 8.0%
Total 21.444 17.2% 43.023 34.6% 30.072 24.2% 26.454 21.3% 3.435 2.8% 124.428100.0%
 
 
Eldorado NF Biomass Offering Overview
(gT = green tons)
 
Eldorado NF
Biomass/Timber Sale Biomass
2011 2012 2013 2014 2015 5-Yr Total
Biomass (gT) 7,460.0 100.0% 27,280.0 100.0% 22,130.0 100.0% 16,480.0 100.0% 3,180.0 100.0% 76,530.0 100.0%
Small Log Biomass (gT) 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0%
Large Log Biomass (gT) 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0%
Total (gT) 7,460.0 9.7% 27,280.0 35.6% 22,130.0 28.9% 16,480.0 21.5% 3,180.0 4.2% 76,530.0100.0%
 
 
Eldorado NF Resource Offering Overview
 
Eldorado NF
Resource Offering Type
2011 2012 2013 2014 2015 5-Yr Total
Fuel Wood 1.984 9.3% 1.984 4.6% 1.984 6.6% 1.984 7.5% 1.984 57.8% 9.920 8.0%
Stewardship 19.180 89.4% 41.039 95.4% 28.088 93.4% 24.470 92.5% 0.000 0.0% 112.777 90.6%
Timber Sale 0.280 1.3% 0.000 0.0% 0.000 0.0% 0.000 0.0% 1.451 42.2% 1.731 1.4%
Total 21.444 17.2% 43.023 34.6% 30.072 24.2% 26.454 21.3% 3.435 2.8% 124.428 100.0%
 
 
Eldorado NF Road Access Overview
 
Eldorado NF
Road Access
2011 2012 2013 2014 2015 5-Yr Total
Yes 21.442 100.0% 43.023 100.0% 30.072 100.0% 26.454 100.0% 3.435 100.0% 124.426 100.0%
No 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0% 0.000 0.0%
Total 21.442 17.2% 43.023 34.6% 30.072 24.2% 26.454 21.3% 3.435 2.8% 124.426100.0%
 
 
Eldorado NF 5-year offering
 
Eldorado NF:
Amador RD
5-yr = 29.5 mmbf
gT = 15,530
  • <4" = 0.0 % (0.000 mmbf)
  • 4"-7" = 10.5 % (3.106 mmbf)
  • <7" = 0.0 % (0.000 mmbf)
S = 9.585
  • 7"-9" = 19.1 % (5.647 mmbf)
  • 9"-12" = 13.4 % (3.938 mmbf)
  • 7"-12" = 0.0 % (0.000 mmbf)
L = 16.807
  • >12" = 57.0 % (16.807 mmbf)
View Offering By Year: 2011 ~ 2012 ~ 2013 ~ 2014 ~ 2015
View 5-Year Data Table
Return to Maps
Eldorado NF 5-year offering
 
Eldorado NF:
Georgetown RD
5-yr = 29.8 mmbf
gT = 20,200
  • <4" = 0.0 % (0.000 mmbf)
  • 4"-7" = 13.6 % (4.040 mmbf)
  • <7" = 0.0 % (0.000 mmbf)
S = 11.034
  • 7"-9" = 25.2 % (7.520 mmbf)
  • 9"-12" = 11.8 % (3.514 mmbf)
  • 7"-12" = 0.0 % (0.000 mmbf)
L = 14.734
  • >12" = 49.4 % (14.734 mmbf)
View Offering By Year: 2011 ~ 2012 ~ 2013 ~ 2014 ~ 2015
View 5-Year Data Table
Return to Maps
Eldorado NF 5-year offering
 
Eldorado NF:
Pacific RD
5-yr = 19.5 mmbf
gT = 11,000
  • <4" = 0.0 % (0.000 mmbf)
  • 4"-7" = 11.3 % (2.200 mmbf)
  • <7" = 0.0 % (0.000 mmbf)
S = 6.560
  • 7"-9" = 19.8 % (3.860 mmbf)
  • 9"-12" = 13.8 % (2.700 mmbf)
  • 7"-12" = 0.0 % (0.000 mmbf)
L = 10.764
  • >12" = 55.1 % (10.764 mmbf)
View Offering By Year: 2011 ~ 2012 ~ 2013 ~ 2014 ~ 2015
View 5-Year Data Table
Return to Maps
Eldorado NF 5-year offering
 
Eldorado NF:
Placerville RD
5-yr = 45.6 mmbf
gT = 29,800
  • <4" = 0.0 % (0.000 mmbf)
  • 4"-7" = 13.1 % (5.960 mmbf)
  • <7" = 0.0 % (0.000 mmbf)
S = 16.594
  • 7"-9" = 25.0 % (11.380 mmbf)
  • 9"-12" = 11.4 % (5.214 mmbf)
  • 7"-12" = 0.0 % (0.000 mmbf)
L = 23.044
  • >12" = 50.5 % (23.044 mmbf)
View Offering By Year: 2011 ~ 2012 ~ 2013 ~ 2014 ~ 2015
View 5-Year Data Table
Return to Maps
 
 

Return to Top
 
 
Coordinated Resource Offering Protocol or "CROP" is an online graphics enabled database assembled by Oregon-based Mater Ltd. to help businesses and community organization groups generate a picture of likely annual fiber offering/supply and characteristics to be offered from public lands and forest restoration projects over the next five years. Valid XHTML 1.0 TransitionalValid CSS!
2008-  Mater Engineering, LTD
Web Design by MyKeyWeb