Last Updated 02-26-2010
State of Utah CROP: BLM offering/removal 2010-2014 (gT = 368,033 / S = 186.479 mmbf / L = 18.085 mmbf) (278.171 total mmbf)
gT = green tons (up to 7"dbh) S = small log mmbf (>7"-12"dbh) L = large log mmbf (>12"dbh)
BLM Field Offices
Arizona BLM ~ 2%(gT = 12,125 / S = 1.675 / L = 0.300)
Utah BLM ~ 88%(gT = 342,150 / S = 159.910 / L = 16.720)
Colorado BLM ~ 10%(gT = 12,602 / S = 23.520 / L = 0.960)
Wyoming BLM ~ 1%(gT = 1,157 / S = 1.374 / L = 0.105)
This content requires javascript.
gT
mmbf
BLM
Biomass
Small Log
Large Log
2010
77,011.2
39.6930
3.7451
2011
77,461.2
41.6730
3.9051
2012
77,461.2
41.4730
3.8751
2013
68,050.0
31.8200
3.2800
2014
68,050.0
31.8200
3.2800
Totals
368,033.5
186.4790
18.0854
%
26%
67%
7%
mmbf
73.6067
BLM Diameter by Year
This content requires javascript.
This content requires javascript.
This content requires javascript.
This content requires javascript.
This content requires javascript.
BLM NEPA Process Overview
This content requires javascript.
BLM NEPA Process
2010
2011
2012
2013
2014
5-Yr Total
Approved
43.570
89.7%
5.550
11.5%
2.300
4.8%
0.000
0.0%
0.000
0.0%
51.420
21.7%
In Process
1.375
2.8%
33.875
69.9%
9.345
19.4%
2.810
6.1%
2.810
6.1%
50.215
21.2%
Just Started
0.125
0.3%
5.525
11.4%
33.125
68.6%
0.000
0.0%
0.000
0.0%
38.775
16.4%
Not Started
3.500
7.2%
3.500
7.2%
3.500
7.3%
43.000
93.9%
43.000
93.9%
96.500
40.7%
Total
48.570
20.5%
48.450
20.5%
48.270
20.4%
45.810
19.3%
45.810
19.3%
236.910 100.0%
BLM Biomass Offering Overview (gT = green tons)
This content requires JavaScript.
BLM Biomass/Timber Sale Biomass
2010
2011
2012
2013
2014
5-Yr Total
Biomass (gT)
77,011.2
100.0%
77,461.2
100.0%
77,461.2
100.0%
68,050.0
100.0%
68,050.0
100.0%
368,033.5
100.0%
Small Log Biomass (gT)
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
Large Log Biomass (gT)
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
Total (gT)
77,011.2
20.9%
77,461.2
21.0%
77,461.2
21.0%
68,050.0
18.5%
68,050.0
18.5%
368,033.5 100.0%
BLM Resource Offering Overview
This content requires javascript.
BLM Resource Offering Type2010
2011
2012
2013
2014
5-Yr Total
Biomass
46.274
78.6%
48.504
79.4%
48.274
79.3%
45.200
92.8%
45.200
92.8%
233.452
83.9%
Fuel Wood
2.066
3.5%
2.066
3.4%
2.066
3.4%
2.010
4.1%
2.010
4.1%
10.218
3.7%
Pre-Commercial Thinning
0.008
0.0%
0.008
0.0%
0.008
0.0%
0.000
0.0%
0.000
0.0%
0.023
0.0%
Timber Sale
10.493
17.8%
10.493
17.2%
10.493
17.2%
1.500
3.1%
1.500
3.1%
34.478
12.4%
Total
58.840
21.2%
61.070
22.0%
60.840
21.9%
48.710
17.5%
48.710
17.5%
278.171
100.0%
BLM Road Access Overview
This content requires javascript.
BLM Road Access
2010
2011
2012
2013
2014
5-Yr Total
Yes
48.570
100.0%
48.450
100.0%
48.270
100.0%
45.810
100.0%
45.810
100.0%
236.910
100.0%
No
0.000
0.0%
0.000
0.0%
0.000
0.0%
0.000
0.0%
0.000
0.0%
0.000
0.0%
Total
48.570
20.5%
48.450
20.5%
48.270
20.4%
45.810
19.3%
45.810
19.3%
236.910 100.0%
BLM 5-year offering
BLM: Arizona Strip FO
5-yr = 4.4 mmbf
gT = 12,125
<4" = 19.6 % (0.863 mmbf)
4"-7" = 35.5 % (1.563 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 1.675
7"-9" = 24.4 % (1.075 mmbf)
9"-12" = 13.6 % (0.600 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 0.300
>12" = 6.8 % (0.300 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: Cedar City FO
5-yr = 31.2 mmbf
gT = 42,400
<4" = 5.2 % (1.610 mmbf)
4"-7" = 22.0 % (6.870 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 20.610
7"-9" = 34.9 % (10.890 mmbf)
9"-12" = 31.2 % (9.720 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 2.110
>12" = 6.8 % (2.110 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: Fillmore FO
5-yr = 24.4 mmbf
gT = 33,750
<4" = 5.1 % (1.250 mmbf)
4"-7" = 22.6 % (5.500 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 16.000
7"-9" = 32.9 % (8.000 mmbf)
9"-12" = 32.9 % (8.000 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 1.600
>12" = 6.6 % (1.600 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: GSENM FO
5-yr = 24.3 mmbf
gT = 32,500
<4" = 5.1 % (1.250 mmbf)
4"-7" = 21.6 % (5.250 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 16.100
7"-9" = 33.1 % (8.050 mmbf)
9"-12" = 33.1 % (8.050 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 1.690
>12" = 7.0 % (1.690 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: Kanab FO
5-yr = 24.8 mmbf
gT = 33,750
<4" = 5.0 % (1.250 mmbf)
4"-7" = 22.2 % (5.500 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 16.400
7"-9" = 33.1 % (8.200 mmbf)
9"-12" = 33.1 % (8.200 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 1.660
>12" = 6.7 % (1.660 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: Kemmerer FO
5-yr = 1.0 mmbf
gT = 578
<4" = 0.8 % (0.008 mmbf)
4"-7" = 11.1 % (0.108 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 0.810
7"-9" = 18.8 % (0.183 mmbf)
9"-12" = 64.3 % (0.627 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 0.050
>12" = 5.1 % (0.050 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: Little Snake FO
5-yr = 0.2 mmbf
gT = 842
<4" = 50.0 % (0.084 mmbf)
4"-7" = 50.0 % (0.084 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 0.000
7"-9" = 0.0 % (0.000 mmbf)
9"-12" = 0.0 % (0.000 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 0.000
>12" = 0.0 % (0.000 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: Moab FO
5-yr = 11.8 mmbf
gT = 21,250
<4" = 8.5 % (1.000 mmbf)
4"-7" = 27.7 % (3.250 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 6.500
7"-9" = 27.7 % (3.250 mmbf)
9"-12" = 27.7 % (3.250 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 1.000
>12" = 8.5 % (1.000 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: Monticello FO
5-yr = 11.8 mmbf
gT = 21,250
<4" = 8.5 % (1.000 mmbf)
4"-7" = 27.7 % (3.250 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 6.500
7"-9" = 27.7 % (3.250 mmbf)
9"-12" = 27.7 % (3.250 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 1.000
>12" = 8.5 % (1.000 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: Pinedale FO
5-yr = 0.6 mmbf
gT = 572
<4" = 3.6 % (0.023 mmbf)
4"-7" = 14.8 % (0.092 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 0.470
7"-9" = 21.6 % (0.135 mmbf)
9"-12" = 53.9 % (0.335 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 0.038
>12" = 6.1 % (0.038 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: Price FO
5-yr = 23.3 mmbf
gT = 30,500
<4" = 5.4 % (1.250 mmbf)
4"-7" = 20.8 % (4.850 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 15.700
7"-9" = 33.7 % (7.850 mmbf)
9"-12" = 33.7 % (7.850 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 1.500
>12" = 6.4 % (1.500 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: Richfield FO
5-yr = 24.8 mmbf
gT = 33,750
<4" = 5.0 % (1.250 mmbf)
4"-7" = 22.2 % (5.500 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 16.400
7"-9" = 33.1 % (8.200 mmbf)
9"-12" = 33.1 % (8.200 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 1.660
>12" = 6.7 % (1.660 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: Rock Springs FO
5-yr = 0.1 mmbf
gT = 7
<4" = 0.0 % (0.000 mmbf)
4"-7" = 1.3 % (0.001 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 0.094
7"-9" = 14.8 % (0.017 mmbf)
9"-12" = 68.5 % (0.077 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 0.017
>12" = 15.5 % (0.017 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: Salt Lake FO
5-yr = 24.4 mmbf
gT = 33,750
<4" = 5.1 % (1.250 mmbf)
4"-7" = 22.6 % (5.500 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 16.000
7"-9" = 32.9 % (8.000 mmbf)
9"-12" = 32.9 % (8.000 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 1.600
>12" = 6.6 % (1.600 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: St. George FO
5-yr = 21.0 mmbf
gT = 29,250
<4" = 4.8 % (1.000 mmbf)
4"-7" = 23.2 % (4.850 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 13.700
7"-9" = 32.7 % (6.850 mmbf)
9"-12" = 32.7 % (6.850 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 1.400
>12" = 6.7 % (1.400 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: Vernal FO
5-yr = 23.5 mmbf
gT = 30,000
<4" = 5.3 % (1.250 mmbf)
4"-7" = 20.2 % (4.750 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 16.000
7"-9" = 34.0 % (8.000 mmbf)
9"-12" = 34.0 % (8.000 mmbf)
7"-12" = 0.0 % (0.000 mmbf)
L = 1.500
>12" = 6.4 % (1.500 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps
BLM 5-year offering
BLM: White River FO
5-yr = 26.8 mmbf
gT = 11,760
<4" = 4.4 % (1.176 mmbf)
4"-7" = 4.4 % (1.176 mmbf)
<7" = 0.0 % (0.000 mmbf)
S = 23.520
7"-9" = 0.0 % (0.000 mmbf)
9"-12" = 39.4 % (10.560 mmbf)
7"-12" = 48.3 % (12.960 mmbf)
L = 0.960
>12" = 3.6 % (0.960 mmbf)
This content requires javascript.
View Offering By Year: 2010 ~ 2011 ~ 2012 ~ 2013 ~ 2014
View 5-Year Data Table
Return to Maps